MAY 6.00% 5.3¢ melbana energy limited

exactly ,the drill crew would have know this would not flow to...

  1. 3,259 Posts.
    lightbulb Created with Sketch. 445
    exactly ,the drill crew would have know this would not flow to surface hence the simulation test with water proved the reservoir had movable oil and pressure giving a estimate of 750bpd ,all it means is the pressure and weight of oil in the string out weighed the reservoir pressure ,as along as the drill hole fills with oil it will be pumped out , alot very rich companies around using donkey pumps ,
    unit 2 might be a ace yet
    https://hotcopper.com.au/data/attachments/5509/5509972-56cb4dd8b9142604b9817140009f41ba.jpg
    Schematic illustration of water injection in an oil reservoir. Cross section show the distribution of oil and water before and after the water has displaced the oil in porous matrix.
    Last edited by the flow: 15/08/23
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.003(6.00%)
Mkt cap ! $178.6M
Open High Low Value Volume
5.4¢ 5.4¢ 5.0¢ $154.8K 2.985M

Buyers (Bids)

No. Vol. Price($)
1 100000 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 113206 1
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
5.3¢
  Change
0.003 ( 4.33 %)
Open High Low Volume
5.4¢ 5.4¢ 5.0¢ 1347067
Last updated 15.56pm 03/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.