MAY 4.55% 2.1¢ melbana energy limited

Ann: Block 9 Alameda 2 Appraisal Update, page-50

  1. 3,019 Posts.
    lightbulb Created with Sketch. 5733
    summary.

    • Net pay in Amistad (1, 2 and 3) in Alameda 2 is nearly 6 x greater than that recorded in Alameda 1 (100m v 600m), taking fracture porosity into account, using formation image log data. People can work out what that means for themselves. Its massive.
    • The oil is heavy, but it flows.
    • Unit 1A will need to be pumped (we knew that already).
    • Unit 3 flowed at 750 bbl/day unassisted. 1.5 psi/metre. The flow was controlled by a 2 km water cushion in the tubing (safety measure to prevent uncontrolled flow and formation/well damage). The water cushion was almost displaced (8.5 m3 out of 10 m3 ) by the oil flow into the well.
    • No water flowed into the well from the formation.
    • Unit 1B we dont know, until they test it.
    • Unit 2 we dont know, until they test it (being tested atm).
    • Theyre saying basal (bottom) section of Units 2 and 3 have the most fractures.
    • DSTs taking longer than expected.

    Its like living in a resort serving all you can eat oysters and lobster and champagne ...its 10 am, on my first day. I have a week to go (Alameda -3).
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
-0.001(4.55%)
Mkt cap ! $70.77M
Open High Low Value Volume
2.2¢ 2.2¢ 2.1¢ $35.52K 1.682M

Buyers (Bids)

No. Vol. Price($)
6 491469 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 935810 9
View Market Depth
Last trade - 16.10pm 14/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.