Hi All,
For those interested, just Posting my review of yesterday's ASX 15/8/23 announcement.
IMO, with respect to the DST, an expected result with an estimated flow rate of 750 bopd and would expect this to increase with use of an Electrical Submersible Pump (ESP).
IMO, a confusing statement by AP that needs clarifying was "could be produced in the future" (see Slide 3 - point 10) - as I had been expecting an immediate extended production test to follow the DST testing of all Amistad zones. Possibility that AP (or who wrote the Release) was thinking along the lines of a full field development - and thus would need a Certified / Approved development project that will take some time but not preclude production through running extended production tests for appraisal wells being drilled.
Points in Slide 1 refer to the points in Slides 2 & 3. Slides 4 & 5 are back-ups that are referenced to.
GLTAH
Cheers
VOGC
- Forums
- ASX - By Stock
- MAY
- Ann: Block 9 Alameda 2 Appraisal Update
Ann: Block 9 Alameda 2 Appraisal Update, page-521
-
- There are more pages in this discussion • 388 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
0.002(6.90%) |
Mkt cap ! $104.4M |
Open | High | Low | Value | Volume |
3.0¢ | 3.1¢ | 3.0¢ | $23.16K | 752.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 511097 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 330507 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 511097 | 0.030 |
13 | 1947939 | 0.029 |
9 | 3047022 | 0.028 |
7 | 1614740 | 0.027 |
4 | 1950000 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 265829 | 4 |
0.032 | 416507 | 7 |
0.033 | 400954 | 5 |
0.034 | 1275000 | 4 |
0.035 | 1040266 | 2 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |