MAY 9.09% 2.4¢ melbana energy limited

Ann: Block 9 Alameda 2 Appraisal Update, page-603

  1. 3,602 Posts.
    lightbulb Created with Sketch. 1914
    kit67,

    I would say that if reserves are north of 500mmbo I could see over 50 wells on structure with sustained production over 50,000bopd for over a decade. It will probably come down to getting in a pipeline and obviously quite a few more well pads. Chances are it's double that atleast. This would be an excellent foundation asset and would meet Cuba's energy needs.

    Production per well will depend on connectivity too fractures and pressure drawdown and obviously reservoir engineering if artificial lift or pumps are required. Understanding how the reservoir behaves and whether recovery factors are accurate over time.

    I will add that no oil/water contact and no formation water points to further downdip potential. AP eluded to potentially needing new seismic given the results to date. Something tells me it's potentially much bigger then envisioned.

    best of luck holders
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.002(9.09%)
Mkt cap ! $80.88M
Open High Low Value Volume
2.2¢ 2.4¢ 2.2¢ $123.7K 5.384M

Buyers (Bids)

No. Vol. Price($)
4 2419592 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 3008000 13
View Market Depth
Last trade - 16.10pm 31/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.