Share
2,042 Posts.
lightbulb Created with Sketch. 136
clock Created with Sketch.
17/08/23
09:40
Share
Originally posted by Kangaroos67:
↑
Well put together kit The dumping over the previous days is purely from speculators looking for instant success, the people who bother to read and learn will understand what you have posted and we have for sometime, longterm success for me. This drill has confirmed that we do in fact have a company making production asset of considerable size and value in a country thats suffering from low crude production rates I have personally been speaking with AP re lateral drilling for some time, trust me, this has always been the intent at the end of the day Absolutely you can produce out of this well and we will, but future drilling will all be horizontals If the deeper Marti hits the spot and is light API this should flow at considerable rates and would only require vertical wells, but still capable of laterals depending economics and returns. The elephant is still to be unearthed
Expand
And it should, i remember the phrase "the well was coming at us" from the A1 program