MAY 0.00% 3.2¢ melbana energy limited

It will require much more than a pump.... We have been through...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 6,605 Posts.
    lightbulb Created with Sketch. 2497
    It will require much more than a pump.... We have been through this, they need to build a compressor station lol. Good luck.

    But!..... You cannot perform enhanced oil recovery with a compressor and a pump alone, it requires much much more than that. and they might need to spend 6-12months to calculate if it is feasible at all, especially in Cuba.
    Last edited by Flambeau: 15/08/23
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.