As I understand it level 3 is open hole flow test. As Kenny points out the pressures here are good so the flow results should be a few days away. Level 2 and 1b requires perforation and will be a bit longer.
Sadly the McDaniels update is a cake that needs a lot of baking, at least 2 months. Hopefully some instos will start buying up to stabilise the SP over this period. With luck we will see 20c with the flow tests.
- Forums
- ASX - By Stock
- MAY
- Ann: Block 9 Alameda 2 Increase in Net Pay
Ann: Block 9 Alameda 2 Increase in Net Pay, page-84
-
- There are more pages in this discussion • 751 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
2.4¢ |
Change
0.001(4.35%) |
Mkt cap ! $80.88M |
Open | High | Low | Value | Volume |
2.4¢ | 2.4¢ | 2.3¢ | $68.51K | 2.960M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 338720 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 2244796 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 338720 | 0.023 |
19 | 6368773 | 0.022 |
21 | 2118175 | 0.021 |
23 | 5412776 | 0.020 |
8 | 961198 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 2244796 | 10 |
0.025 | 900000 | 2 |
0.026 | 2393955 | 9 |
0.027 | 1126611 | 3 |
0.028 | 1562711 | 10 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |