MAY 4.35% 2.2¢ melbana energy limited

Ann: Block 9 Alameda 3 Appraisal Update (Alameda reservoir), page-118

  1. 7,851 Posts.
    lightbulb Created with Sketch. 1522
    Yeah that mud emulsion is messing with fractures and permeability and blocking flow something fierce. That kind of surface pressure is roughly 10kpsi reservoir pressure (assuming the majority of the string is still mud @ average sg=1.5)
    Last edited by justinmetals: 27/06/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $444.7K 19.98M

Buyers (Bids)

No. Vol. Price($)
3 2048367 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1402823 5
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.