MAY 5.00% 2.1¢ melbana energy limited

Ann: Block 9 Alameda 3 Appraisal Update (Alameda reservoir), page-118

  1. 7,881 Posts.
    lightbulb Created with Sketch. 1524
    Yeah that mud emulsion is messing with fractures and permeability and blocking flow something fierce. That kind of surface pressure is roughly 10kpsi reservoir pressure (assuming the majority of the string is still mud @ average sg=1.5)
    Last edited by justinmetals: 27/06/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
0.001(5.00%)
Mkt cap ! $72.45M
Open High Low Value Volume
2.1¢ 2.2¢ 2.1¢ $33.68K 1.602M

Buyers (Bids)

No. Vol. Price($)
4 2631800 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 1387773 10
View Market Depth
Last trade - 10.56am 12/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.