MAY 4.35% 2.2¢ melbana energy limited

Ann: Block 9 Alameda 3 Appraisal Update (Alameda reservoir), page-267

  1. 3,432 Posts.
    lightbulb Created with Sketch. 412
    I have a suspicion alexii that the entire formation is now damaged in some way . Contrast the diff in both holes drilled in this 2nd production hole there was an alarming ( for me) lack of news and pictures of oil over shakers and gas flares none, nada that set alarms off and i discussed with 8ty that we needed to keep open minded about why, one reason was a well suberbly balanced, Ha!.

    Now in this ann we see how much fluids are recovered which were paltery which in turn meant they were over powering on the way down and sealing.

    i fear acid by the shipload wont do it but a sidetrack into the first exploration hole which flowed and kicked very well might be a workaround. Imo

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $444.7K 19.98M

Buyers (Bids)

No. Vol. Price($)
3 2048367 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1402823 5
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.