MAY 11.5% 2.3¢ melbana energy limited

Ann: Block 9 Alameda 3 Appraisal Update (Alameda reservoir), page-459

  1. 400 Posts.
    lightbulb Created with Sketch. 71
    Just wondering where this was reported
    3. Does the team understand why there was flow rate drop off on 1B from 1900 to <300 bopd?

    My understanding was this was reported,
    • Peak flows to the surface result in 1903 barrels of oil (BOE) per day from unit 1B at an average and stabilised flow rate of 1235 BOE per day
    Which resulted in this
    During the testing, more than 1000 barrels of oil were produced and transported away.

    Thxs
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
-0.003(11.5%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.5¢ 2.6¢ 2.3¢ $124.0K 5.095M

Buyers (Bids)

No. Vol. Price($)
10 2808380 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 339712 5
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.