MAY 6.06% 3.5¢ melbana energy limited

I am left with OB as the logical fault. To be so one has...

  1. 3,393 Posts.
    lightbulb Created with Sketch. 407
    I am left with OB as the logical fault. To be so one has takenthe eye completely off the ball in terms of monitoring mud/ fluid loss into the structure one would think.

    This fault/mistake has cost and is costing a lot ofmoney to the company and SH value, someone at groundlevel and board level need to be accountable one would think.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
0.002(6.06%)
Mkt cap ! $117.9M
Open High Low Value Volume
3.3¢ 3.6¢ 3.3¢ $577.5K 16.92M

Buyers (Bids)

No. Vol. Price($)
5 1018559 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 1521853 6
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.