MAY 4.35% 2.2¢ melbana energy limited

Ann: Block 9 Alameda 3 Appraisal Update (Alameda reservoir), page-881

  1. 42 Posts.
    lightbulb Created with Sketch. 4
    It will take 8 months to have enough stock pile to fill the smallest GP tanker of 70000 barrels; production of 300 barrels per day.
    SP will deteriorate to 1 cent by then.
    Brace for impact!
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.