MAY 6.06% 3.5¢ melbana energy limited

Zapato 1 ST- The well will now be suspended so that the...

  1. 14 Posts.
    lightbulb Created with Sketch. 3
    Zapato 1 ST- The well will now be suspended so that the subsurface interpretation maybe reviewed once all the new data sets have been incorporated. (27th October 2022)

    Alameda 3- There may have been a reaction between the different fluid system we are using this time (which has delivered excellent well control) and the reservoir so we’re going to pause this test whilst we study the samples and data we’ve obtained (17th June 2024).

    Another two years may be. CR is coming.
    Last edited by fishmarket: 17/06/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
0.002(6.06%)
Mkt cap ! $117.9M
Open High Low Value Volume
3.3¢ 3.6¢ 3.3¢ $577.5K 16.92M

Buyers (Bids)

No. Vol. Price($)
5 1018559 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 1521853 6
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.