MAY 6.67% 3.2¢ melbana energy limited

There is no need to abandon the well. If they can't solve the...

  1. 18,562 Posts.
    lightbulb Created with Sketch. 2630
    There is no need to abandon the well.

    If they can't solve the blockage issue, just side track from a few hundred metres above Marti and drill to another location, to conduct the flow test. There is no indication the hole is collapsing (they installed liners already).

    Might as well finish the job.
    Last edited by Cosmoterios: 18/06/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.2¢
Change
0.002(6.67%)
Mkt cap ! $107.8M
Open High Low Value Volume
3.1¢ 3.2¢ 2.9¢ $140.0K 4.586M

Buyers (Bids)

No. Vol. Price($)
3 256226 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 635458 8
View Market Depth
Last trade - 16.10pm 04/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.