There is no need to abandon the well.
If they can't solve the blockage issue, just side track from a few hundred metres above Marti and drill to another location, to conduct the flow test. There is no indication the hole is collapsing (they installed liners already).
Might as well finish the job.
- Forums
- ASX - By Stock
- Ann: Block 9, Alameda-3 Appraisal Update
There is no need to abandon the well. If they can't solve the...
-
-
- There are more pages in this discussion • 431 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
3.2¢ |
Change
0.002(6.67%) |
Mkt cap ! $107.8M |
Open | High | Low | Value | Volume |
3.1¢ | 3.2¢ | 2.9¢ | $140.0K | 4.586M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 256226 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 635458 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 256226 | 0.031 |
6 | 478728 | 0.030 |
14 | 2957934 | 0.029 |
20 | 2835170 | 0.028 |
11 | 1384803 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 635458 | 8 |
0.033 | 700000 | 3 |
0.034 | 1200000 | 4 |
0.035 | 4622460 | 9 |
0.036 | 776300 | 5 |
Last trade - 16.10pm 04/07/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |