MAY 6.06% 3.5¢ melbana energy limited

I would have thought that to flow test Alameda you would need to...

  1. 3,603 Posts.
    lightbulb Created with Sketch. 1099
    I would have thought that to flow test Alameda you would need to plug off Marti and then if Alameda flows there is no way to return to Marti without interfering and interferance from Alameda, so if any corrective procedure was to be attempted it would need to be done now. Thus any acid or other flow inducement is a matter for future wells?. Any sidetrack would only be viable if Alameda also failed? My experience with drilling a water well is that slotted liners block easily so perhaps it comes down to a poor choice?. Moving on to Alameda one hopes that whatever the cause forMarti not flowing, it is not repeated.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
0.002(6.06%)
Mkt cap ! $117.9M
Open High Low Value Volume
3.3¢ 3.6¢ 3.3¢ $577.5K 16.92M

Buyers (Bids)

No. Vol. Price($)
5 1018559 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 1521853 6
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.