MAY 0.00% 4.5¢ melbana energy limited

takes alot reading to understand theses things , the big issue...

  1. 3,346 Posts.
    lightbulb Created with Sketch. 470
    takes alot reading to understand theses things , the big issue with getting the well bore clear will be supply in cuba , unlikely there would be enough acid to what we needed if any , as far as blast perorations crews, this a very specialist field so once again probably zip in cuba along with the equipment needed to do the job again zip in cuba , so we had no choice but to suspend and move up until the acid and blast crews could be found and the cost will be huge there invoice would have 000 000 to start ,the slotted liner was probably chosen because of the high pressure that are there which oil would force in no problem under normal circumstances with out the mud ,
    the plan will be try acid which should work , if not drop the crackers down and blow the liner and rewash with acid ,seem the whole string in marti is blocked , both of theses are known to be the most dangerous jobs on a rig ,having clowns mess with this is not a good idea , the mud doctors sure got it right keeping the well under control this time ,we were lucky when the casing tool got stuck lucky they found a specialist to get it out ,note the photo our guy on the right the specialist on the left ,this time no specialists around ,
    ap will be deciding if they get the crackers or just acid , i would get both on site ready
    if alameda flows well marti will be put on hold for awhile ,
    oil will flow from A3, we need oil to flow

    JUST REMEMBER MARTI AND A 3 ARE NOT DEAD JUST DELAYED

    happy holding my marti
    thankyou for your good posts justinmetals
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
4.5¢
Change
0.000(0.00%)
Mkt cap ! $151.6M
Open High Low Value Volume
4.6¢ 4.7¢ 4.4¢ $494.2K 10.86M

Buyers (Bids)

No. Vol. Price($)
2 714056 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.7¢ 462413 7
View Market Depth
Last trade - 16.10pm 19/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.