MAY 4.17% 2.3¢ melbana energy limited

Alameda is not cemented in. It’s a naked hole liner with zone...

  1. 7,868 Posts.
    lightbulb Created with Sketch. 1523
    Alameda is not cemented in. It’s a naked hole liner with zone Packers only. The main reason they didn’t cement in to prevent exact reason why the mud has probably screwed up the formation in Marti. I.e. the cement would penetrate too deep into the Huge fracture network. I also believe Melbana have their own perforating gun and this is easily run down on a string. I would not be surprised The bottom section of Alameda has already been perforated and testing already underway, having discussed this with a fellow well known expert geoscientist MAY investor yesterday.
    Last edited by justinmetals: 19/06/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
-0.001(4.17%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.3¢ 2.4¢ 2.2¢ $61.98K 2.702M

Buyers (Bids)

No. Vol. Price($)
4 753326 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 2582136 17
View Market Depth
Last trade - 16.10pm 29/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.