    The elephant in the room, that I've seen no answer on..
    How do they flow test Alameda, ie perforate the liner, flow test it , unloading some mud weight and subsequently load up with mud again to get back down to Marti and acid wash, without knackering the Alameda reservoir with mud invasion?
    If Alameda flows, are they really gonna jeopardise it knowing a failure at marti could FUBAR the entire well?
    Can some one address this issue, which seems the basis of why we are flow testing from the bottom up in the first place?
    Thanks tc
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
4.3¢
Change
-0.002(4.44%)
Mkt cap ! $144.9M
Open High Low Value Volume
4.5¢ 4.6¢ 4.2¢ $176.8K 4.017M

Buyers (Bids)

No. Vol. Price($)
10 1371566 4.2¢
 

Sellers (Offers)

Price($) Vol. No.
4.3¢ 164997 1
View Market Depth
Last trade - 16.10pm 20/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.