MAY melbana energy limited

Ann: Block 9, Alameda-3 Appraisal Update, page-541

  1. 3,514 Posts.
    lightbulb Created with Sketch. 1142
    I dont think theres a problem with testing the Alameda then running a completion strig/sleeves over the perforated sections, this may be a full length string with packers or individual sliding sleeve type over each section.
    It may be a reduction in tubing size from less then 4 1/2" though, normally completion strings are engineered to support this In the well design prior to drilling the well

    Last edited by Kangaroos67: 20/06/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.2¢
Change
0.000(0.00%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.2¢ 2.3¢ 2.2¢ $9.873K 439.8K

Buyers (Bids)

No. Vol. Price($)
19 4315727 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1466587 6
View Market Depth
Last trade - 13.00pm 23/06/2025 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.