I dont think theres a problem with testing the Alameda then running a completion strig/sleeves over the perforated sections, this may be a full length string with packers or individual sliding sleeve type over each section.
It may be a reduction in tubing size from less then 4 1/2" though, normally completion strings are engineered to support this In the well design prior to drilling the well
- Forums
- ASX - By Stock
- Ann: Block 9, Alameda-3 Appraisal Update
I dont think theres a problem with testing the Alameda then...
-
-
- There are more pages in this discussion • 216 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
2.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $77.51M |
Open | High | Low | Value | Volume |
2.4¢ | 2.4¢ | 2.3¢ | $8.143K | 339.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 2359550 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 2122366 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 2366198 | 0.023 |
17 | 5771992 | 0.022 |
23 | 2273918 | 0.021 |
22 | 4412776 | 0.020 |
10 | 1161198 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 2122366 | 10 |
0.025 | 989721 | 4 |
0.026 | 2406955 | 9 |
0.027 | 1126611 | 3 |
0.028 | 1562711 | 10 |
Last trade - 10.41am 26/07/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |