So we have this statement
"A contributing factor to the lower-than-expected performance of the Marti reservoir could be attributable to emulsions formed between oil and drilling mud in the lower portion of the test string. Those concerns have been incorporated into the design of the Alameda reservoir flow testing program to monitor for anomalies, gain further insights into flow rates optimisation and improve results."
My interpretation: They've kinda learnt something from the Marti flow test...they've incorporated these learnings for the Alameda flow test...looks like it's a success and it starts flowing (presumption) and they have the confidence to draw a line in the sand and will conclude in 5 days.
This is the basis for my optimism...feel free to interpret the announcements to suit your own disposition.
Peace.
- Forums
- ASX - By Stock
- Ann: Block 9, Alameda-3 flow testing commences
So we have this statement"A contributing factor to the...
-
- There are more pages in this discussion • 127 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
3.5¢ |
Change
0.002(6.06%) |
Mkt cap ! $117.9M |
Open | High | Low | Value | Volume |
3.3¢ | 3.6¢ | 3.3¢ | $577.5K | 16.92M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1018559 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 1521853 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 959736 | 0.034 |
14 | 3448407 | 0.033 |
12 | 948770 | 0.032 |
15 | 1042258 | 0.031 |
19 | 1562832 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 1426853 | 5 |
0.036 | 1805472 | 7 |
0.037 | 449333 | 3 |
0.038 | 535000 | 2 |
0.039 | 2392577 | 5 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online