MAY 3.13% 3.3¢ melbana energy limited

Ann: Block 9, Alameda-3 flow testing commences, page-192

  1. 10,189 Posts.
    lightbulb Created with Sketch. 1986
    to put down 20 wells I think one well every 6 months a well and 6 months to begin its production. But if they had 2 rigs on site then 2 wells a year and the spending around 5-10 million a well as 30 percent ownership and around 150 million dollars for the piping. Big period ahead
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.