Hi Afawcett. I was hoping that you or anyone could explain to me something that was in the latest announcement. In Fig.3 the angle of the proposed drill shown is a much shallower angle than I have seen on any other diagram. It states "Build to 25deg @ 5deg/100m" and then further down "Hold approx. 25deg to TD". This is a bit confusion to me. Does it mean the drill trajectory will be at 25deg to the vertical? Or to the horizontal? Or something else?
Thanks in anticipation.
- Forums
- ASX - By Stock
- MAY
- Ann: Block 9 Commencement of Alameda-3 drilling
Ann: Block 9 Commencement of Alameda-3 drilling, page-101
- There are more pages in this discussion • 455 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.2¢ |
Change
-0.002(2.83%) |
Mkt cap ! $175.2M |
Open | High | Low | Value | Volume |
5.3¢ | 5.3¢ | 5.1¢ | $59.79K | 1.148M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1199055 | 5.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.2¢ | 560708 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1199055 | 0.051 |
9 | 3125000 | 0.050 |
7 | 1185000 | 0.049 |
3 | 1415000 | 0.048 |
3 | 364000 | 0.047 |
Price($) | Vol. | No. |
---|---|---|
0.052 | 560708 | 4 |
0.053 | 739572 | 6 |
0.054 | 766863 | 7 |
0.055 | 295281 | 5 |
0.056 | 384320 | 4 |
Last trade - 12.36pm 27/05/2024 (20 minute delay) ? |
|
|||||
Last
5.1¢ |
  |
Change
-0.002 ( 1.92 %) |
|||
Open | High | Low | Volume | ||
5.2¢ | 5.2¢ | 5.1¢ | 502752 | ||
Last updated 12.26pm 27/05/2024 ? |
Featured News
MAY (ASX) Chart |