MAY 4.35% 2.4¢ melbana energy limited

Ann: Block 9 Commencement of Alameda-3 drilling, page-114

  1. 2,989 Posts.
    lightbulb Created with Sketch. 5696
    they may be running the cement as we speak. The ROP was over 150m/day...
    so they would have hit the section TD yesterday;
    pulled the rods and washed all the oil off them;
    put a pump down the hole and filled up the drill rig fuel tanks;
    then started running in the casing; and finally
    cement job.

    ...im surprised not many commented on the reference to plenty of oil on cuttings on the way down.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.