Development planning underway
Work is continuing to determine the optimal way to bring the Amistad reservoir into production, including engineering reviews of existing and required infrastructure, oil valuation and commercialisation pathway studies and discussions with potential oil off takers.
- Forums
- ASX - By Stock
- Ann: Block 9 Commencement of Alameda-3 drilling
Development planning underway Work is continuing to determine...
-
- There are more pages in this discussion • 542 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
-0.002(6.06%) |
Mkt cap ! $104.4M |
Open | High | Low | Value | Volume |
3.4¢ | 3.4¢ | 3.0¢ | $165.0K | 5.194M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 1439331 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 39999 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 1439331 | 0.030 |
8 | 923671 | 0.029 |
4 | 3108572 | 0.028 |
5 | 1089148 | 0.027 |
5 | 365071 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 39999 | 1 |
0.032 | 100000 | 1 |
0.033 | 70000 | 1 |
0.034 | 371756 | 1 |
0.035 | 150000 | 1 |
Last trade - 16.10pm 09/10/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online