MAY 2.17% 4.7¢ melbana energy limited

Andrew Tab. Re. Cape size tanker. It will be a long time before...

  1. 85 Posts.
    lightbulb Created with Sketch. 24
    Andrew Tab. Re. Cape size tanker. It will be a long time before we need a tanker at the rate we are going. It is anticipated that 23 truck semi trailer loads will be delivered by road from Marti to the tank battery or 5000 barrels per day. At this rate capacity required to fill a cape size tanker could take around 100 days. I expect all of our product will be required to satisfy current domestic demand.

    All of our funds will be exhausted with the ongoing development of block 9. Our ability to finance our 30% share for the construction of a pipeline from Marti could be our greatest challenge in 2024. Does anybody know the size of the existing pipeline from the tank battery to Martinez? GLTAH.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
4.7¢
Change
0.001(2.17%)
Mkt cap ! $158.4M
Open High Low Value Volume
4.6¢ 4.8¢ 4.6¢ $236.1K 5.022M

Buyers (Bids)

No. Vol. Price($)
1 100000 4.7¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 102957 1
View Market Depth
Last trade - 15.52pm 21/05/2024 (20 minute delay) ?
Last
4.7¢
  Change
0.001 ( 3.07 %)
Open High Low Volume
4.6¢ 4.8¢ 4.6¢ 2598332
Last updated 15.52pm 21/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.