The last paragraph in particular is the most intriguing. I’m desperately to hear about this infrastructure and engineering works that’s ongoing and how we can increase the production. Per well pad before the pipeline connection is completed and I want to hear about tanks concrete runways lights, traffic control systems helicopter pads the works. I don’t know about the helicopter pads! Looking forward to the webinar should be very interesting
- Forums
- ASX - By Stock
- Ann: Block 9 Commencement of Alameda-3 drilling
The last paragraph in particular is the most intriguing. I’m...
-
- There are more pages in this discussion • 529 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
0.002(3.77%) |
Mkt cap ! $185.3M |
Open | High | Low | Value | Volume |
5.2¢ | 5.5¢ | 5.1¢ | $261.5K | 4.892M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 125000 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 422199 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 125000 | 0.053 |
4 | 355173 | 0.052 |
2 | 19803 | 0.051 |
4 | 359780 | 0.050 |
2 | 115003 | 0.049 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 422199 | 2 |
0.056 | 284321 | 3 |
0.057 | 230000 | 2 |
0.058 | 406379 | 3 |
0.059 | 254025 | 3 |
Last trade - 16.10pm 06/05/2024 (20 minute delay) ? |
|
|||||
Last
5.4¢ |
  |
Change
0.002 ( 3.85 %) |
|||
Open | High | Low | Volume | ||
5.3¢ | 5.5¢ | 5.1¢ | 1548133 | ||
Last updated 15.58pm 06/05/2024 ? |
Featured News
MAY (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online