MAY 4.29% 7.3¢ melbana energy limited

Ann: Block 9 Commencement of Alameda-3 drilling, page-307

  1. 85 Posts.
    lightbulb Created with Sketch. 24
    @roch. Obviously maths at school was not your strong point and you have not improved since. 23 truck loads from Marti to the Tank Battery per day = 5000 barrels per day x 5 days per week = 25.000 barrels per week x 52 weeks = 1.3m barrels per year or if it's a 7 day per week operation it is 1.82m barrels per year. The existing Amistad pipeline could deliver around 220m to 300m barrels per year one way.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
7.3¢
Change
0.003(4.29%)
Mkt cap ! $246.0M
Open High Low Value Volume
7.1¢ 7.4¢ 7.1¢ $839.0K 11.62M

Buyers (Bids)

No. Vol. Price($)
2 455467 7.3¢
 

Sellers (Offers)

Price($) Vol. No.
7.4¢ 705500 5
View Market Depth
Last trade - 16.10pm 07/06/2024 (20 minute delay) ?
Last
7.4¢
  Change
0.003 ( 6.02 %)
Open High Low Volume
7.1¢ 7.4¢ 7.0¢ 3963620
Last updated 15.59pm 07/06/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.