MAY 4.35% 4.8¢ melbana energy limited

I located the Amistad oil pipeline that was constructed in 2007...

  1. 85 Posts.
    lightbulb Created with Sketch. 24
    I located the Amistad oil pipeline that was constructed in 2007 21" diameter which has a capacity of 134.000 B/D. It runs from the supertanker Port of Martazas to the oil refinery at Camilo Cienfeugas which is 189 klm. There is a midstream pump station at Jaguey Grande which is about 60 klm from Marti by road. Jaguey Grande could be the ideal destination point for our pipeline to access the existing infrastructure. GLTAH
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
0.002(4.35%)
Mkt cap ! $158.4M
Open High Low Value Volume
4.6¢ 4.8¢ 4.6¢ $153.5K 3.270M

Buyers (Bids)

No. Vol. Price($)
3 120000 4.7¢
 

Sellers (Offers)

Price($) Vol. No.
4.8¢ 91853 1
View Market Depth
Last trade - 12.43pm 21/05/2024 (20 minute delay) ?
Last
4.8¢
  Change
0.002 ( 5.26 %)
Open High Low Volume
4.6¢ 4.8¢ 4.6¢ 1513071
Last updated 12.58pm 21/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.