MAY 4.35% 2.2¢ melbana energy limited

Ann: Block 9 - Early Production and Spud of Alameda-3, page-52

  1. 4,385 Posts.
    lightbulb Created with Sketch. 753
    Still in the end the operation will be constrained by logistics of moving all that oil. Rather be in that position than scratching around with pumps and optimisation in the cooper basin
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.2¢ $41.26K 1.791M

Buyers (Bids)

No. Vol. Price($)
8 1303214 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 280000 3
View Market Depth
Last trade - 16.10pm 19/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.