MAY 4.29% 7.3¢ melbana energy limited

If the oil is in sufficient volumes, the construction of the...

  1. 106 Posts.
    lightbulb Created with Sketch. 17
    If the oil is in sufficient volumes, the construction of the pipeline may be much faster than thought. If this discovery is considered one of national significance the Cubans will throw everything at it. 30 kilometres on 130 days seems not unreasonable.

    Does anyone have experience in laying and welding pipe and what distance per day is reasonable?
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
7.3¢
Change
0.003(4.29%)
Mkt cap ! $246.0M
Open High Low Value Volume
7.1¢ 7.4¢ 7.1¢ $839.0K 11.62M

Buyers (Bids)

No. Vol. Price($)
2 455467 7.3¢
 

Sellers (Offers)

Price($) Vol. No.
7.4¢ 705500 5
View Market Depth
Last trade - 16.10pm 07/06/2024 (20 minute delay) ?
Last
7.4¢
  Change
0.003 ( 6.02 %)
Open High Low Volume
7.1¢ 7.4¢ 7.0¢ 3963620
Last updated 15.59pm 07/06/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.