The well head will have chokes to control pressure as per normal. bop is only used when needed in an uncontrolled well. The well is always flowing back drilling fluids whilst drilling. Once the cement liner is complete above the resevoir the plug will be drilled out and the well head shut in and pressures tested. It is only in the case of the well head failure that the bop is used.
- Forums
- ASX - By Stock
- MAY
- Ann: Block 9 - Maiden Contingent Resources
Ann: Block 9 - Maiden Contingent Resources, page-93
-
-
- There are more pages in this discussion • 361 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $107.8M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 50 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 190755 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50 | 0.031 |
7 | 458728 | 0.030 |
13 | 2926182 | 0.029 |
18 | 1731599 | 0.028 |
11 | 1384803 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 190755 | 5 |
0.033 | 756635 | 4 |
0.034 | 1200000 | 4 |
0.035 | 4622460 | 9 |
0.036 | 776300 | 5 |
Last trade - 09.37am 05/07/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
Day chart unavailable