MAY 1.43% 6.9¢ melbana energy limited

Ann: Block 9 - Maiden Contingent Resources, page-93

  1. 684 Posts.
    lightbulb Created with Sketch. 178
    The well head will have chokes to control pressure as per normal. bop is only used when needed in an uncontrolled well. The well is always flowing back drilling fluids whilst drilling. Once the cement liner is complete above the resevoir the plug will be drilled out and the well head shut in and pressures tested. It is only in the case of the well head failure that the bop is used.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
6.9¢
Change
-0.001(1.43%)
Mkt cap ! $232.5M
Open High Low Value Volume
7.0¢ 7.0¢ 6.8¢ $275.1K 3.983M

Buyers (Bids)

No. Vol. Price($)
1 289170 6.9¢
 

Sellers (Offers)

Price($) Vol. No.
7.0¢ 560000 2
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
6.9¢
  Change
-0.001 ( 1.85 %)
Open High Low Volume
7.0¢ 7.0¢ 6.8¢ 2492935
Last updated 15.59pm 14/06/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.