MAY 3.64% 5.3¢ melbana energy limited

luv the update!!!very slow going though.....thoughts on why the...

  1. 3,609 Posts.
    lightbulb Created with Sketch. 1037
    luv the update!!!
    https://hotcopper.com.au/data/attachments/6055/6055289-15d24a1522e66090baf51b3d67a4b82b.jpg

    very slow going though.....thoughts on why the slow rate of progress???

    "Drilling ahead continues in 8-1/2” hole and is currently at 3120 metres MD enroute to the first coring point planned for 3211 metres MD, after which drilling ahead will continue to the final planned casing point in the seal above the Marti Structure, planned for ~3586 metres MD."

    12 March 2024: 3045mMD
    25 March 2024: 3120mMD

    13 DAYS!!! 75M!!! BARELY ~6M A DAY!???!!

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
-0.002(3.64%)
Mkt cap ! $178.6M
Open High Low Value Volume
5.4¢ 5.4¢ 5.2¢ $215.6K 4.068M

Buyers (Bids)

No. Vol. Price($)
10 1990394 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 15000 1
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
5.2¢
  Change
-0.002 ( 1.89 %)
Open High Low Volume
5.4¢ 5.4¢ 5.2¢ 1210770
Last updated 15.38pm 10/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.