MAY 6.00% 5.3¢ melbana energy limited

Ann: Block 9 Status of Alameda 3 and Operational Update, page-4

  1. 6,676 Posts.
    lightbulb Created with Sketch. 1622
    So the well will be drilling until March 2024 all going well.

    Chances of yet another CR.
    These guys.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.003(6.00%)
Mkt cap ! $178.6M
Open High Low Value Volume
5.4¢ 5.4¢ 5.0¢ $154.8K 2.985M

Buyers (Bids)

No. Vol. Price($)
1 100000 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 113206 1
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
5.3¢
  Change
0.003 ( 4.33 %)
Open High Low Volume
5.4¢ 5.4¢ 5.0¢ 1347067
Last updated 15.56pm 03/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.