MAY 3.64% 5.3¢ melbana energy limited

Ann: Block 9 Status of Alameda 3 and Operational Update, page-76

  1. 1,284 Posts.
    lightbulb Created with Sketch. 69
    Thanks. Kangaroos67 I knew the whole drill would take 90 days but there are a few zones to go through on the way down. This is the exciting news we have been waiting for
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
-0.002(3.64%)
Mkt cap ! $178.6M
Open High Low Value Volume
5.4¢ 5.4¢ 5.2¢ $215.6K 4.068M

Buyers (Bids)

No. Vol. Price($)
10 1990394 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 15000 1
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
5.2¢
  Change
-0.002 ( 1.89 %)
Open High Low Volume
5.4¢ 5.4¢ 5.2¢ 1210770
Last updated 15.38pm 10/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.