All government approvals now granted, "shovel ready" and the Front-End Engineering Design progressing; expecting for the capital requirement to be significantly reduced versus the feasability study. Looks promising at 11.4g/t, wonder what the overall OPEX costs will be. Much needed.
- Forums
- ASX - By Stock
- CAI
- Ann: Blue Spec project fully permitted to commence mining
Ann: Blue Spec project fully permitted to commence mining, page-2
-
- There are more pages in this discussion • 99 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable