BM8 0.00% 14.0¢ battery age minerals ltd

Ann: BM8 Critical Minerals Projects Update, page-17

  1. 163 Posts.
    lightbulb Created with Sketch. 77
    The resource consultant is not really a technical need, they will engage their selected partner (guessing it will be AMC again considering the common people with CRR) to have an “auditable” review that market will respect. BM8 geologist(S) are more than capable in estimating the resource but as Steven says, they need to get what most people would consider a commercial resource which is around 8-10MT. This number is whats generally commercial assuming typical strip ratio and CAPEX costs of a concentration processing facility. BM8 will have a very low strip ratio and push comes to shove can DSO into GT1 Seymour concentrator so we can probably get away with a lot less resource than the required 10MT. Having said that, (BM8 hasn’t drilled no where near enough for any resource disclosure. They are still in discovery mode. Once you start seeing more closely spaced drilling like 100m spacing then they’re getting close to that objective. My guess is then need another 30-40k more drilling to get to the required 10MT so perhaps another year at the rate they’re going if we all want to be realistic with the target objective
 
watchlist Created with Sketch. Add BM8 (ASX) to my watchlist
(20min delay)
Last
14.0¢
Change
0.000(0.00%)
Mkt cap ! $13.02M
Open High Low Value Volume
14.0¢ 15.0¢ 13.5¢ $43.42K 314.4K

Buyers (Bids)

No. Vol. Price($)
1 54000 14.0¢
 

Sellers (Offers)

Price($) Vol. No.
15.0¢ 43999 2
View Market Depth
Last trade - 15.10pm 28/06/2024 (20 minute delay) ?
BM8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.