Boda can be compared to the Hillside project which was recently taken over by MACH Metals for A$393 million.
https://www.mining.com/indonesian-group-to-buy-hillside-copper-project-in-australia-for-265-million/
Boda open pit: 422 million tonnes at 0.31g/t gold and 0.18% copper (0.56 g/t AuEq) over 17 years. Capital outlay: A$1,783 million in 2024 study.
Hillside: 337 million tonnes at 0.14 g/t gold and 0.56% copper (0.9 g/t AuEq) over 13 years. Capital outlay: A$854 million in 2022 study.
The Hillside project has a higher AuEq grade and lower capital costs than Boda.
- Forums
- ASX - By Stock
- Ann: Boda-Kaiser Scoping Study
Boda can be compared to the Hillside project which was recently...
-
-
- There are more pages in this discussion • 70 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ALK (ASX) to my watchlist
(20min delay)
|
|||||
Last
44.0¢ |
Change
0.005(1.15%) |
Mkt cap ! $265.5M |
Open | High | Low | Value | Volume |
45.0¢ | 46.0¢ | 44.0¢ | $2.169M | 4.835M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 62348 | 44.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
45.0¢ | 141846 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 62348 | 0.440 |
9 | 79604 | 0.435 |
7 | 143854 | 0.430 |
4 | 66352 | 0.425 |
3 | 22700 | 0.420 |
Price($) | Vol. | No. |
---|---|---|
0.450 | 141846 | 3 |
0.455 | 6800 | 2 |
0.460 | 121733 | 3 |
0.465 | 30000 | 2 |
0.470 | 8000 | 2 |
Last trade - 16.10pm 01/08/2024 (20 minute delay) ? |
Featured News
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
ALK (ASX) Chart |