ALK 1.27% 40.0¢ alkane resources limited

Ann: Boda-Kaiser Scoping Study, page-66

  1. 52 Posts.
    lightbulb Created with Sketch. 39
    Thanks for that, just read their latest PR. For starters this is a project not an operating mine so they haven’t demonstrated that they can economically recover anything at a commercial scale. Secondly their Cu grade of 0.20% has assumed a recovery of 76% (reflecting a tails grade of around 0.05%). Additionally their assumed processing cost is C$12.50/t milled (~A$13.50/t milled). If the same parameters were applied to this project you’re looking at at an increase in AISC of around $400. And that’s assuming Boda can recover copper at 84.5%.
 
watchlist Created with Sketch. Add ALK (ASX) to my watchlist
(20min delay)
Last
40.0¢
Change
0.005(1.27%)
Mkt cap ! $241.3M
Open High Low Value Volume
40.5¢ 40.5¢ 39.5¢ $217.3K 543.2K

Buyers (Bids)

No. Vol. Price($)
2 8800 40.0¢
 

Sellers (Offers)

Price($) Vol. No.
40.5¢ 140277 5
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
ALK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.