Thanks for that, just read their latest PR. For starters this is a project not an operating mine so they haven’t demonstrated that they can economically recover anything at a commercial scale. Secondly their Cu grade of 0.20% has assumed a recovery of 76% (reflecting a tails grade of around 0.05%). Additionally their assumed processing cost is C$12.50/t milled (~A$13.50/t milled). If the same parameters were applied to this project you’re looking at at an increase in AISC of around $400. And that’s assuming Boda can recover copper at 84.5%.
- Forums
- ASX - By Stock
- ALK
- Ann: Boda-Kaiser Scoping Study
Ann: Boda-Kaiser Scoping Study, page-66
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ALK (ASX) to my watchlist
(20min delay)
|
|||||
Last
40.0¢ |
Change
0.005(1.27%) |
Mkt cap ! $241.3M |
Open | High | Low | Value | Volume |
40.5¢ | 40.5¢ | 39.5¢ | $217.3K | 543.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 8800 | 40.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
40.5¢ | 140277 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 8800 | 0.400 |
4 | 40797 | 0.395 |
2 | 11800 | 0.390 |
2 | 13987 | 0.385 |
15 | 204898 | 0.380 |
Price($) | Vol. | No. |
---|---|---|
0.405 | 125421 | 4 |
0.410 | 2439 | 1 |
0.420 | 52000 | 4 |
0.425 | 11463 | 3 |
0.430 | 18900 | 2 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
ALK (ASX) Chart |