• Orinoco´s `Back to Basics` approach delivers further Bonanza grades.
• 6 batches returned grades of 40.74, 31.85, 30.45, 27.58, 16.71, 8.31 g/t from pilot hammer mills.
• Average processed grade of 35 samples have returned 36.17 g/t.
• Large hammer mill Installed and will mill high grade ore this week.
• Panel sampling of Cuca completed.
• Mestre Access and Mestre Decline link completed.
• Production Ramp up underway with new mining methods concentrating on ore vein.
• 2nd LHD on route to Brazil.
• Significant cost reductions.
Looks like all's on track for a break to new recent highs.
Avg of 36 g/t....don't see that much.