SVL silver mines limited

Ann: Bonanza Grade Silver from the Aegean Zone at Bowdens Project, page-7

  1. 814 Posts.
    lightbulb Created with Sketch. 191
    From Stock head:

    Silver

    Silver mines’ grades in 2020 were about 125g/t on average, with silver priced at approximately A$31 at the time of writing.

    This gives silver miners $124.60 per tonne (125/31.1 x 31) of throughput, on average before all costs.

    But that average would be higher at projects such asSilver Mines’(ASX:SVL) Bowdens project, which has often recorded grades of over 1000g/t with current drilling consistently 300-500g/t.

    Last edited by suds100: 15/05/23
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
12.0¢
Change
0.005(4.35%)
Mkt cap ! $213.5M
Open High Low Value Volume
12.0¢ 12.0¢ 11.0¢ $635.0K 5.481M

Buyers (Bids)

No. Vol. Price($)
1 26335 11.5¢
 

Sellers (Offers)

Price($) Vol. No.
12.0¢ 1551088 16
View Market Depth
Last trade - 16.10pm 27/06/2025 (20 minute delay) ?
SVL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.