I'd call cliff foss, his us number is on the asx announcements. the QLD office is just a shell.
We have to have news by next friday, frankly I don't know what to think, you would have to think if the results were steller then we would have heard something.... however another well permitted 1km away with a 500m longer horizontal speaks confidence...
400bbls per day is 100 to TPD 3000 per month is $300k per month, which is not too shabby from where we are now...
- Forums
- ASX - By Stock
- Ann: Bonner 1H Fraccing Successful
I'd call cliff foss, his us number is on the asx announcements....
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)