An MRP holder will have info, I haven't looked into it much.
Nimbus Silver-Zinc-Gold ProjectMacPhersons’ remains on track to start production at its Nimbus project in 2014 with final works being undertaken by CPC Engineering to complete the refurbishment of the existing leach tanks. Additionally, international plant manufacturer FLSmidth has confirmed that the new 480,000 tonne per annum Merrill-Crowe gold-silver processing plant is on schedule for dispatch of the modular components to Kalgoorlie in August/September 2013. This ensures that the Nimbus project remains on schedule for delivery of all long lead items by October 2013, with construction and commissioning in the first half of 2014.
- Forums
- ASX - By Stock
- Ann: Boorara Mining Underway - First Gold July 2020
An MRP holder will have info, I haven't looked into it...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $49.21M |
Open | High | Low | Value | Volume |
4.4¢ | 4.5¢ | 4.3¢ | $7.913K | 180.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 395809 | 4.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.4¢ | 576951 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 23809 | 0.042 |
2 | 212196 | 0.041 |
6 | 2579564 | 0.040 |
6 | 1063883 | 0.039 |
4 | 272578 | 0.038 |
Price($) | Vol. | No. |
---|---|---|
0.044 | 548271 | 3 |
0.045 | 359115 | 2 |
0.046 | 122346 | 3 |
0.047 | 13712 | 1 |
0.048 | 14143 | 2 |
Last trade - 15.36pm 13/09/2024 (20 minute delay) ? |
Featured News
HRZ (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online