SGC 0.00% 0.5¢ sacgasco limited

On completion of Dempsey, the drill rig was demobilized and a...

  1. 312 Posts.
    lightbulb Created with Sketch. 249
    On completion of Dempsey, the drill rig was demobilized and a work over rig was brought in to conduct flow testing.

    The change over from ”Drill Rig” to “Work Over Rig” was about 2-3 weeks from memory.

    IMO - Its during this time that we will find out whether we have a commercial operation or not.

    JW
 
watchlist Created with Sketch. Add SGC (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $3.898M
Open High Low Value Volume
0.5¢ 0.5¢ 0.5¢ $11.72K 2.345M

Buyers (Bids)

No. Vol. Price($)
3 1900272 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 5631294 8
View Market Depth
Last trade - 14.55pm 14/06/2024 (20 minute delay) ?
Last
0.5¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.4¢ 0.5¢ 0.4¢ 368632
Last updated 14.55pm 14/06/2024 ?
SGC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.