XST 0.00% 0.9¢ xstate resources limited

Last Ann 10 days ago stated Flow testing will commence late...

  1. 90 Posts.
    lightbulb Created with Sketch. 15

    Last Ann 10 days ago stated Flow testing will commence late march, start of next week is late March.

    *****The Anshof wellsite has provision for up to 3 drilling slots, the Anshof-3 surface location was approved first by
    all necessary authorities to allow spudding. Anshof is fully covered by modern 3D seismic and is on trend
    existing producing oilfields in the NW (Voitsdorf, Bad Hall and Pfarrkirchen) and in the NE (Sierning) as shown
    in Figure 2.
    The other drilling slots will be used for near term appraisal and development drilling. The objective of the next
    wells will be to maximize well productivity by targeting areas of thicker Eocene reservoir development as shown
    in Figure 3.******

    Yall Need Patience IMO

    Cheers







 
watchlist Created with Sketch. Add XST (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.