re: Ann: Boseto Commissioning Update, Septemb... Anyone got a Mining Engineering degree to decipher this update? You'll also need a calculator handy to convert between all the different units quoted.
On the surface sounds all OK, but from my reckoning they produced 1000 tonnes of copper in August. Design is 36000 tonnes per annum or 3000 per month. It mentions throughput of feed is 75%. Therefore are we likely to hit the copper number or not?
Hi Brad Sampson, how about some clear updates??