It's about the powerline construction - that is the best they could come up with.
"These proceedings do not challenge any of the environmental impacts or other impacts of the operations associated with the Project. The proceedings are judicial review proceedings and only challenge whether the IPC adequately considered matters relating to the location and construction of a powerline which may be required to power the mine site."
- Forums
- ASX - By Stock
- SVL
- Ann: Bowdens Silver Project Proceedings
Ann: Bowdens Silver Project Proceedings, page-5
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVL (ASX) to my watchlist
|
|||||
Last
16.5¢ |
Change
-0.005(2.94%) |
Mkt cap ! $248.8M |
Open | High | Low | Value | Volume |
17.0¢ | 17.5¢ | 16.5¢ | $371.9K | 2.195M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 601830 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 825159 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 590249 | 0.165 |
40 | 2560783 | 0.160 |
26 | 1300951 | 0.155 |
42 | 1401355 | 0.150 |
22 | 1047861 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 821599 | 15 |
0.175 | 2977894 | 25 |
0.180 | 2468100 | 25 |
0.185 | 1075506 | 13 |
0.190 | 1007923 | 19 |
Last trade - 14.02pm 12/07/2024 (20 minute delay) ? |
Featured News
SVL (ASX) Chart |